The country's exports (manganese, processed wood, palm oil) and most of its imports go through the Owendo port complex, south of Libreville. The port is linked to the interior by the Trans-Gabon railway, the country's only railway line, which serves the Moanda mining basin and Franceville. Crude oil is exported through dedicated terminals around Port-Gentil and in southern Ogooué-Maritime.
Only a small share of the road network is paved, which raises inland transport costs and gives rail and coastal shipping a central role. For investors and logistics operators, the key points to watch are terminal capacity at Owendo, the reliability of the Trans-Gabon railway, progress on the Libreville-Franceville road and the availability of electricity.
Ports, stations, airports and corridors
- Airport, Oil terminal, Port
- Border post, Railway
- Railway station
- Road corridor
The map cannot be displayed in this browser. The list of places remains available.
List of places (46)
- Bitam Airport Airport
- M'Vengue El Hadj Omar Bongo Ondimba International Airport (Franceville) Airport
- Gamba Airport Airport
- Koulamoutou-Mabimbi Airport Airport
- Lambaréné Airport Airport
- Lastoursville Airport Airport
- Léon Mba International Airport (Libreville) Airport
- Makokou Airport Airport
- Mayumba Airport Airport
- Mékambo Airfield Airport
- Moanda Airfield Airport
- Mouila Airport Airport
- Okondja Airport Airport
- Oyem Airport Airport
- Port-Gentil International Airport Airport
- Tchibanga Airport Airport
- Doussala border post (Congo) Border post
- Eboro border post (Cameroon) Border post
- Meyo-Kyé border post (Equatorial Guinea and Cameroon) Border post
- Cap Lopez oil terminal Oil terminal
- Etame terminal Oil terminal
- Gamba oil terminal Oil terminal
- Oguendjo terminal Oil terminal
- Owendo Mineral Port (Arise P&L) Port
- Port of Port-Gentil Port
- Libreville Port-Môle Port
- Port of Owendo (commercial port and container terminal) Port
- Owendo mineral port (Comilog) Port
- Acaé secondary port (Libreville) Port
- Trans-Gabon railway (Owendo-Franceville) Railway
- Alembé station Railway station
- Andem station Railway station
- Ayem station Railway station
- Booué station Railway station
- Franceville station Railway station
- Ivindo station Railway station
- Lastoursville station Railway station
- Lopé station Railway station
- Moanda station Railway station
- Ndjolé station Railway station
- Ntoum station Railway station
- Otoumbi station Railway station
- Owendo station Railway station
- Libreville-Ndjolé-Oyem-Bitam-Cameroon border corridor Road corridor
- Libreville-Ntoum-Cocobeach road Road corridor
- Libreville-Lambaréné-Mouila-Ndendé-Congo border corridor (RN1) Road corridor
Ports
The port of Owendo, under the authority of the Gabon Ports and Harbours Office (OPRAG), brings together several specialised terminals. The commercial port, run by Gabon Port Management, has a 455-metre quay with four berths and handles about 6 million tonnes a year according to OPRAG. The container terminal is run by Owendo Container Terminal (OCT), a subsidiary of Africa Global Logistics (AGL).
The New Owendo International Port (NOIP) was inaugurated in October 2017. This multipurpose terminal, developed by GSEZ Ports with Bolloré Transport & Logistics and the Olam group, has a 500-metre quay with 13 metres of water, grain silos and palm oil tanks. In August 2019, according to Ship Technology, GSEZ Ports secured 305 million euros of financing, including 40 million from the African Development Bank (AfDB), for new facilities. In December 2023, according to Gabonreview, AGL announced 20 billion CFA francs of investment to modernise its Owendo and Port-Gentil terminals, including new cranes.
Manganese is exported through two terminals. The mineral port of Compagnie minière de l'Ogooué (Comilog), in service since 1988, has a 900-metre jetty and a capacity of about 5 million tonnes a year. Owendo Mineral Port, set up in 2016 by Arise Ports & Logistics, Meridiam and the State, loads ore from several producers by barge: 5.28 million tonnes in 2023, after a peak of 6.25 million in 2022.
In Port-Gentil, the commercial port opened in 1979 has a 375-metre quay and 20 hectares under customs control. The city is the hub of oil activities and of the Cap Lopez export terminal.
Main port terminals
| Terminal | Operator | Features |
|---|---|---|
| Owendo commercial port | Gabon Port Management | 455 m quay, 4 berths, about 6 Mt a year |
| Owendo container terminal | Owendo Container Terminal (AGL) | 300 m quay, capacity of 130,000 TEU a year |
| New Owendo International Port | GSEZ Ports (Arise) | 500 m quay, 13 m depth, opened in 2017 |
| Owendo mineral port | Comilog (Eramet) | 900 m jetty, about 5 Mt of manganese a year |
| Owendo Mineral Port | Arise Ports & Logistics | 170 m barge wharf, 5.28 Mt shipped in 2023 |
| Port of Port-Gentil | Gabon Port Management | 375 m quay, 20 ha under customs, opened in 1979 |
Rail: the Trans-Gabon railway
Built between 1974 and 1986, the Trans-Gabon railway links Owendo to Franceville over 648 kilometres of single standard-gauge track, with 23 stations. Since 2003 it has been operated by Setrag (Société d'exploitation du Transgabonais), a subsidiary of Comilog and the Eramet group, which received a 30-year concession in 2005. The line mainly carries manganese, timber and consumer goods, as well as passengers.
According to Setrag, traffic reached about 330,000 passengers and nearly 7 million tonnes of freight in 2019. An upgrade programme (PRN) ran from 2015 to 2024. It is followed by the modernisation and safety programme (PMS) signed on 24 November 2025: 203 million euros, including a 173 million euro loan from the French Development Agency (AFD) and a 30 million euro grant from the European Union. The programme includes replacing 270 kilometres of rail and building 40 kilometres of passing loops. According to Financial Afrik, the State is aiming for freight capacity of 21 million tonnes a year by 2029, against about 9 million today.
The Trans-Gabon railway in figures
Modernisation and safety programme
203 million euros
2025-2028
Freight capacity target
21 million tonnes a year
2029
Roads
According to Gabonreview, the road network covers about 10,000 kilometres, of which less than 2,000 kilometres are paved, or around 20%. According to Ocean's News, the government has set a target of paving 3,000 more kilometres by 2032, following on from the national transition development plan 2024-2026.
National road 1 (RN1) is the main axis: it starts in Libreville and runs through Ntoum, Kango, Lambaréné, Fougamou and Mouila, then Ndendé, the last town before the border with the Republic of the Congo. Beyond Ndendé the road is unpaved. To the north, the road through Ndjolé, Mitzic, Oyem and Bitam reaches Cameroon at Eboro. Another road links Estuaire to Cocobeach on the Equatorial Guinea border.
The Transgabonaise project aims to upgrade the 828-kilometre road between Libreville and Franceville. The public-private partnership was signed on 24 October 2019 for 30 years with Société autoroutière du Gabon (SAG), a company formed by Meridiam and Arise. The first phase covers 81 kilometres between KP 24 and KP 105. In March 2026, Gabonmediatime reported that works had stopped and that the contractor might be replaced.
Airports
Léon Mba International Airport in Libreville is the main air gateway. Its 16,000 m² terminal, dating from 1991, can handle up to 1.2 million passengers a year, and its 10,000 m² cargo terminal can process 40,000 tonnes a year. The runway is 3,000 metres long. The airport handled 773,442 passengers in 2011, the latest public figure found. Its commercial management has been under concession since 1988, while air navigation is handled by the Agency for Aerial Navigation Safety in Africa and Madagascar (ASECNA).
Port-Gentil and Franceville (M'Vengue) have international airports, and around fifteen airfields serve provincial capitals and oil and mining areas. A project for a new Libreville airport at Andem was entrusted to GSEZ in 2018. No construction timetable has been confirmed to date.
Energy
Société d'énergie et d'eau du Gabon (SEEG) distributes water and electricity. Operated under a concession by the Veolia group from 1997, it returned to State control in February 2018. Generation relies on hydropower and on gas- and fuel-oil-fired thermal plants: according to the World Bank, hydropower supplied 46% of the electricity generated in 2023.
The Greater Libreville grid relies on the Kinguélé dam (57.6 MW, in service since 1973) and the Tchimbélé dam (68 MW, 1980), supplemented by thermal plants in Owendo. In Haut-Ogooué, the Grand Poubara dam (160 MW), built by Sinohydro on the Ogooué river and commissioned in 2013, supplies Franceville and the manganese industry in Moanda.
Several projects are meant to add capacity. The Kinguélé Aval dam (34.1 MW), developed by Asonha Énergie (Meridiam and Gabon Power Company), was due for commissioning in the third quarter of 2026 and should cover more than 10% of Libreville's needs. Other hydropower projects are under development: Ngoulmendjim (73 MW) on the Komo river, FE2 (36 MW) near Mitzic and Dibwangui (15 MW) in Ngounié.
Main hydropower plants
Kinguélé Aval (under construction)
34.1 MW
Dams and power plants
- Dam
- Power plant
The map cannot be displayed in this browser. The list of places remains available.
List of places (9)
- Grand Poubara dam Dam
- Kinguélé dam Dam
- Kinguélé Aval dam (under construction) Dam
- Tchimbélé dam Dam
- Alénakiri thermal power plant (Owendo) Power plant
- Bongolo hydroelectric plant Power plant
- Dibwangui hydroelectric plant (project) Power plant
- FE2 hydroelectric plant (project) Power plant
- Ndjolé solar plant Power plant
Telecommunications
Libreville is connected to two international submarine cables: SAT-3/WASC, in service since the early 2000s, and Africa Coast to Europe (ACE), 17,000 kilometres long and in service since December 2012. Inland, the fibre-optic backbone was partly financed by the Central African Backbone (CAB) programme, whose Gabon component (CAB4) was approved by the World Bank in March 2012 for 58 million dollars, with 23 million of additional financing in 2016. The project aimed to extend broadband coverage and lower its price.
Since 2021, the World Bank's Digital Gabon project (68.5 million dollars) has supported the digitisation of public services and digital identity. In 2024, 68.7% of the population used the internet according to the World Bank.
Infrastructure indicators
Container port traffic
180,878 EVP
2024
Source: World Bank
Logistics performance index (LPI)
2.40 /5
2022
Source: World Bank
Access to electricity
95.1 %
2024
Source: World Bank
35.0 %
2024
Source: Our World in Data
Internet users
68.7 %
2024
Source: World Bank
Mobile cellular subscriptions
125.3 Per 100 inhabitants
2024
Source: World Bank
Hydropower and renewable share
% of electricity generation
Hydropower share of electricity generation (Gabon) went from 61.1% in 2000 to 35.0% in 2024. The highest value was reached in 2001 (62.1%). Renewable share of electricity generation (Gabon) went from 61.8% in 2000 to 35.4% in 2024. The highest value was reached in 2001 (62.9%).
| Period | Hydropower share of electricity generation (%) | Renewable share of electricity generation (%) |
|---|---|---|
| 2000 | 61.1 | 61.8 |
| 2001 | 62.1 | 62.9 |
| 2002 | 61.9 | 62.6 |
| 2003 | 58.2 | 58.8 |
| 2004 | 57.5 | 58.2 |
| 2005 | 51.0 | 51.6 |
| 2006 | 56.6 | 57.2 |
| 2007 | 45.7 | 46.2 |
| 2008 | 48.6 | 49.2 |
| 2009 | 51.4 | 51.9 |
| 2010 | 46.6 | 47.2 |
| 2011 | 40.9 | 41.4 |
| 2012 | 41.7 | 42.1 |
| 2013 | 44.5 | 45.0 |
| 2014 | 39.7 | 40.2 |
| 2015 | 42.9 | 43.4 |
| 2016 | 37.4 | 37.9 |
| 2017 | 41.5 | 42.0 |
| 2018 | 46.8 | 47.1 |
| 2019 | 46.1 | 46.5 |
| 2020 | 48.5 | 48.8 |
| 2021 | 46.3 | 46.6 |
| 2022 | 47.6 | 48.0 |
| 2023 | 35.1 | 35.5 |
| 2024 | 35.0 | 35.4 |
Operators and useful sources
-
Gabon Ports and Harbours Office (OPRAG) (opens in a new tab)
Port authority: Owendo and Port-Gentil port profiles.
-
Setrag (opens in a new tab)
Trans-Gabon railway concessionaire: timetables, freight and history.
-
Arise Ports & Logistics, Gabon (opens in a new tab)
Owendo Mineral Port and New Owendo International Port.
-
World Bank, CAB4 Gabon project (opens in a new tab)
Broadband backbone project page.
Setting up close to the infrastructure
The Nkok special investment zone, linked to the railway and the port of Owendo, offers serviced plots and a one-stop shop.
Sources
32 sources cited
- Port d'Owendo (opens in a new tab)
- Port de Port-Gentil (opens in a new tab)
- Gabon (opens in a new tab)
- Owendo Mineral Port (Arise P&L), logisticien portuaire des minerais (opens in a new tab)
- Gabon: Bolloré and Olam join forces to develop and operate Owendo's multipurpose terminal (opens in a new tab)
- Gabon secures $341m funding to expand capacity at Owendo port (opens in a new tab)
- Gabon : AGL annonce un investissement de 20 milliards FCFA pour les ports d'Owendo et Port-Gentil (opens in a new tab)
- Histoire (opens in a new tab)
- Transgabonais (opens in a new tab)
- Setrag lance un Programme de Modernisation et de Sécurisation de la voie ferrée (opens in a new tab)
- Moderniser le rail pour relier l'avenir : signature du Programme de Modernisation et de Sécurisation du Transgabonais (opens in a new tab)
- Routes gabonaises : 600 milliards investis, moins de 2 000 km bitumés (opens in a new tab)
- Gabon : cap sur 3 000 km de routes bitumées d'ici 2032 (opens in a new tab)
- Route nationale 1 (Gabon) (opens in a new tab)
- Transgabonaise Road (opens in a new tab)
- Transgabonaise : vers le remplacement d'Afcons après l'arrêt du chantier (opens in a new tab)
- Aéroport international Léon-Mba (opens in a new tab)
- Libreville International Airport (opens in a new tab)
- Libreville (opens in a new tab)
- Gabon Special Economic Zone (opens in a new tab)
- Énergie au Gabon (opens in a new tab)
- Société d'énergie et d'eau du Gabon (opens in a new tab)
- Grand Poubara Dam (opens in a new tab)
- Visite du chantier du barrage hydroélectrique de Kinguélé Aval et de la carrière de Kinguélé (opens in a new tab)
- FE2 Hydroelectric Power Station (opens in a new tab)
- Dibwangui Hydroelectric Power Station (opens in a new tab)
- Africa Coast to Europe (cable system) (opens in a new tab)
- SAT-3/WASC (opens in a new tab)
- Central African Backbone - APL4 - Gabon (P122776) (opens in a new tab)
- Additional Financing CAB4 (P158299) (opens in a new tab)
- Digital Gabon Project (P175987) (opens in a new tab)
- World Development Indicators : IS.SHP.GOOD.TU, EG.ELC.ACCS.ZS, EG.ELC.HYRO.ZS, IT.NET.USER.ZS (opens in a new tab)